// IR · COLLECTION
INCIDENT REPORTS
Documented events, filed by observers who were present or who arrived after. Reports contradict one another. Where two accounts disagree, the archive keeps both.
⚠ CROSS-REFERENCE BEFORE TRUSTING ANY MEASUREMENT
IR-0203-D
The Hallway That Grew
A corridor measured at 84m on intake. Nine days later it measured 91m. No construction occurred.
PARTIAL INTEG DRIFTING SIG LOW Corridor 7-Y
IR-0144-A
Exit Sign Displacement Event
An illuminated EXIT sign relocated forty metres overnight. The wiring did not follow it.
PARTIAL INTEG DEGRADED SIG MODERATE Level 0 — East Junction